Garage Build - Week 1
After nearly a year of preparations and delays which saw us part ways with two general contractors (GC) - Potomac Garage (worst GCs ever, the main sales guy Zev Pomerance is an outright liar and a crook) and Bowa Builders (ridiculously overpriced) - we finally got all our drawings in place, permits from the county, and finally our GC started work. They had to dig all the way down to 7 feet for the footings before the county gave permission to pour them, and so at the end of week 1, this is what the garage looks like.
First two days of digging:
After the footings were poured, front of the garage:
After the footings were poured, back of the garage:
First two days of digging:
After the footings were poured, front of the garage:
After the footings were poured, back of the garage: