Week 2 involved a lot of sitting around as we waiting for a second Fairfax county inspection. At the end of the week, we had poured the foundation and prepped the ground for the slab.
Foundation.
Ground prepped for the slab.
Assorted ramblings, rants and raves about Music, Food, and Fast Cars
Subscribe to:
Post Comments (Atom)
Labels
- Fast Cars (22)
- Food (21)
- Music (15)
- Stream of Consciousness (45)
No comments:
Post a Comment