Well if I thought yesterday was the day of Oh Noes in this kitchen renovation, boy was I wrong. Today was Oh Noes Part 2!
But first things first, here's how the day started out.
Mark fixing Oh Noes! Part 1 by extending the island out.
Donny putting in Miele bling and doing one last double check on the instructions.
Miele bling installed.
Miele microwave bling.
Miele oven bling.
Miele warming drawer bling.
And then some Wolf bling in the extended island. The 4 supports sticking out are for the 16" countertop extension.
And then Oh Noes!!!! The Subzero enclosure is 10" too small!!!
Mark's reaction when he realizes he had built a 53" Subzero enclosure instead of the required 63" - FAAAAAAAAAAAAAAAAACCCCKKKKKKK!!!!!!!
We tore down the Subzero and will rebuild it next week.
Assorted ramblings, rants and raves about Music, Food, and Fast Cars
Subscribe to:
Post Comments (Atom)
Labels
- Fast Cars (22)
- Food (21)
- Music (15)
- Stream of Consciousness (45)
Blog Archive
-
▼
2008
(26)
-
▼
November
(9)
- Kitchen Reno - Mid-way Evaluation
- Fired up, Ready to go (Day 8 of the Kitchen Reno)
- More than just countertops (Day 7 of the Kitchen R...
- Countertop day (Day 7 of the Kitchen Reno)
- Slick-zeros! (Day 6 of the Kitchen Reno)
- Redemption (Day 5 of the Kitchen Reno)
- Oh Noes - Part 2! (Day 4 of the Kitchen Reno)
- Oh Noes! (Day 3 of the Kitchen Reno)
- Election Day 2008 (or Day 2 of the Kitchen Reno)
-
▼
November
(9)
No comments:
Post a Comment